Autel MaxiCharger AC Wallbox - Three Phase (22kW) EV Charger Hardware with 5m cable
Choose this globally recognised, quality charging brand for a reliable and safe home charging solution with a 5-metre cable.
The Autel MaxiCharger AC Wallbox is a trusted and safe solution for homes, garages, apartments, hospitality properties and workplaces, providing a reliable option and long battery life for smart charging systems.
Product Benefits:
- 3 Year Warranty
- Active load management and dynamic load balancing to reduce electricity costs
- RCD Type A + DC 6mA leakage protection
- OTA updates
- Cloud portal and OCPP capability
- Real-time notification and report through the Autel Charge App for convenient monitoring
- Up to 32A
- 5m charging cable
- Charging speeds 7X faster than a traditional AC home charger
Click here for the Autel MaxiCharger AC Wallbox product brochure, including temperature and mounting specifications.
This product is for hardware only. Once you purchase, you'll receive a call to consider installation for your home through a proven network of trained electricians.
For the best experience with your Autel chargers, you need to use an approved Autel installer. To become approved, please reach out to ausupport@autel.com
*Standard Install Terms and Conditions
Standard Installation:
-
Installation of a 22kW Autel Charger. (Maximum Demand/Current setting to be determined on site).
-
Dedicated circuit of approximately 15 Meters of wall/ceiling mounted cable. (Inc, PVC surface mount conduit) (No more than 400mm of Flexible PVC Conduit in Visible Locations).
-
The isolation switch mounted is readily accessible to the EV Wall Charger.
-
All associated electrical containment and hardware fixings for the installation.
-
Installation of electrical circuit protection in switchboard.
- Installation of Type A RCD at the origin of the circuit. Type A RCDs protect against residual DC Current. (As per AS/NZS 3000:2018 Electrical Installation Wiring Rules).
A standard installation does not involve:
-
Any electrical remedial works to meet current wiring regulations
-
Any groundworks or other civil works
-
Any underfloor work (other than easy underhouse access)
-
Any hidden or structural location not in the ordinary course of installation
-
Work over multi storeys house
-
Switchboard upgrades or three phase power upgrades
- Installation of an EV charger in an apartment building
For any installation that does not fall within the standard install guidelines, JET Charge will provide the customer with any additional costs.
The charger is dispatched ahead of installation works and is coordinated through our customer service departments once the unit arrives on site.
For more information please see our Home Installation Guide.
Want your EV charger installation sorted by JET Charge? Click here and fill out the install form.